City Hall
City Hall is an eco-friendly building situated in Londonโs prestigious Royal Docks. Previously known as The Crystal, the building is now home to the Mayor of London, London Assembly, and the Greater London Authority.
A flashship building that automatically manages its own environmental commitments
Built in 2012, City Hall is a fully electric building with rainwater storage and solar heating. The building produces 70% less carbon emissions than an average UK office. The running of City Hall integrates multiple system providers to create an award-winning smart building focused on driving eco-friendly performance. This case study demonstrates ITVET’s smart building expertise and ability to deploy an innovative and resilient technical strategy.
The challenges
Meeting a strict deadline to prevent downtime with a seamless mobilisation
In January 2019, City Hall appointed ITVET to provide IT, connectivity, and communications – taking over support from Siemens. A major challenge was that every feature of the building was deeply connected to the Siemens network. Therefore, the removal of the Siemens network would mean downtime of toilet facilities, heating, and complete functionality of the building. A strict mobilisation deadline was implemented to design and install a brand new network to maintain the buildingโs functionality with minimal downtime.
Use technological innovations to ensure the building is eco-friendly
City Hall has 3500 data points. Data on energy and water consumption is presented live in the City Hall exhibition every 15 minutes. This shows how much City Hall prioritises eco-friendly innovations to support the smooth running of the building. ITVET was required to create an overarching smart building technical strategy to be the backbone, converging every data point securely and delivering building automation. Creating this strategy involved detailed liaison with Siemens, a full infrastructure audit, and utilising ITVETโs smart building expertise.
Hands on liaison and management with third-party technical providers
All of City Hallโs systems are highly integrated and controlled by the IT network. ITVET understands this and helps manage the relationships with several third-party systems and BMS providers throughout the building.
City Hall’s integrated systems run in harmony to keep it eco-friendly
ITVET’s process
The network design, infrastructure installation, and full mobilisation of City Hall was completed within the outlined timeframe. There was a smooth transition from Siemens to ITVET. The project was closely managed by our expert team. All issues were overcome quickly and efficiently with a very proactive and hands on approach from ITVET.